BlueNord: Preliminary Production for October 2025

Nov 10, 2025

Oslo, 10 November 2025: BlueNord ASA ("BlueNord" or the "Company") has today announced its preliminary production figures for October 2025. In October 2025, the preliminary production was 36.5 mboepd net to BlueNord. 

In October, the Tyra hub delivered an average production of 16.5 mboepd. As previously announced, a planned full-field shutdown was successfully executed from 23 to 26 October, during which the scheduled scope of work and surveys were completed as per plan. The purpose of the shutdown was to further enhance reliability and performance at Tyra. Following the restart, production has been ramping up, and BlueNord expects plateau from Tyra to be reached in Q4 2025.

The base assets Dan, Gorm, and Halfdan produced 20.0 mboepd net to the Company. This was slightly below expectations due to a flowline leak at the Dan hub, which resulted in approximately 60% production reduction for Dan over a seven-day period. The issue was resolved, and full production has resumed. At Gorm, the previously reported operational challenges have been addressed, and the hub has been producing in line with expectations throughout October. Halfdan production remains stable, with operational efficiency exceeding 90%.

This information is subject to disclosure requirements pursuant to section 5-12 of the Norwegian Securities Trading Act. 

*** 

Contact: 
Cathrine Torgersen, Chief Corporate Affairs Officer 
Phone: +47 915 28 501 
Email: cathrine.torgersen@bluenord.com